On the outside, it is covered in knapped flint and charred timber; internal floor space is over 300m2, with the detached building being set in a suburban setting, on third of an acre. 

Info 1

Matt and Davi are available for public speaking events on topics related to self building and diversity equity and inclusion.
 

Fast assembly

The super structure and SIPs panels were all made off-site and delivery via Lorry. Construction took 5 weeks including snagging.

IMG_8531.jpeg

The Project

In 2018 we began planning our Chess Valley project

The Chess Valley project begun as an idea decades ago. Finding the site in 2017 was the catalyst to beginning a 4 year journey from planning, building and completion.

Beginnings

The build

On the outside, it is covered in knapped flint and charred timber; internal floor space is over 300m2, with the detached building being set in a suburban setting, on third of an acre. 

Completion

On the outside, it is covered in knapped flint and charred timber; internal floor space is over 300m2, with the detached building being set in a suburban setting, on third of an acre. 